Conservation Commission Clears Garden Project, Approves Shed Mitigation at 12 Monique Drive

BELLINGHAM — September 24, 2025 — Bellingham Conservation Commission clears garden project, advances shed mitigation in unanimous votes. The commission voted unanimously at its September 24 meeting to issue a negative determination of applicability for a proposed garden at 29 Irish Lane, allowing applicant Ramler to proceed with conditions including no-disturb-zone markers and limits on regrading tire tracks within the 30-foot buffer. At 12 Monique Drive, the board approved an order of conditions allowing a 359-square-foot shed to remain in the wetland buffer zone, with mitigation plantings at a 2-to-1 ratio — using smaller-caliper trees for better establishment — and a planting plan due by June 15, 2026, subject to three years of monitoring. The board also directed staff to notify the owner of 380 Lake Street that a formal wetland delineation must be submitted by early November or a violation notice will be considered.

Keep reading with a 14-day free trial

Subscribe to The Bellingham MA Post to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to The Bellingham MA Post

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe

More local coverage: Norfolk County News · The Braintree Post · The Brookline Post · The Canton Post · The Cohasset Post · The Dedham Post

Part of the Townbrief network — local government coverage for 350+ Massachusetts towns.