Bellingham Planning Board Moves Maple Street Contractor Complex Toward Final Decision
BELLINGHAM — January 23, 2025 — Bellingham Planning Board advances long-revised Maple Street contractor-condo project toward a final decision. The board voted unanimously Thursday to continue the public hearing on the zero Maple Street development to February 13 and directed town planner Rob Orr to draft a positive decision covering three concurrent permits — a development plan approval, a Scenic Road permit, and a flex-parking special permit — before a hard deadline of February 28. The project, redesigned multiple times since its original submission, would create five 3,000-square-foot contractor-rental bays intended for tradespeople, with 28 parking spaces against a zoning requirement of 30. Board members pressed applicant engineer Shane Oates to add four to six mature trees to the stamped landscape plan to match renderings showing robust screening, and to include a condition prohibiting outdoor fleet vehicle storage. One board member said he remains "a little concerned" about the driveway's proximity to a Route 126 bridge where vehicles travel well above the posted speed limit, despite the project's compliance with AASHTO sight-distance standards.
Keep reading with a 14-day free trial
Subscribe to The Bellingham MA Post to keep reading this post and get 14 days of free access to the full post archives.
A subscription gets you:
- Subscriber-only posts and full archive
- Post comments and join the community
- 24x7 access to local news